HYDRO BRIDGE and TUNNELLING PROJECTS made EASY

A highly renowned hydro, bridge and tunneling contractor from the northern part of India found an ideal solution in BF90.3 to more competitively diversify his business. An esteemed customer of MB Crusher recently won a tender where they were required to undertake a bridge construction work in a very remote location in the northern part

HYDRO BRIDGE and TUNNELLING PROJECTS made EASY
BF90

A highly renowned hydro, bridge and tunneling contractor from the northern part of India found an ideal solution in BF90.3 to more competitively diversify his business.

An esteemed customer of MB Crusher recently won a tender where they were required to undertake a bridge construction work in a very remote location in the northern part of India. The project site was located in the hilly terrain where mobility of heavy equipment and trucks was difficult and also electricity connection hard to obtain and sustain.

For their project, there was a significant requirement of 20 mm down aggregates to prepare concrete and 40 mm down to maintain the base strength. The concrete was used to make the bridge.

With the site being in a remote area, transportation cost for aggregates were coming excessively high but also the availability of the aggregate material at their site was scarce as the trucks were not filled to their optimum level due to uneven hilly terrain. Moreover, it was very difficult to install a stationary crusher due to inadequate land and scarcity of electricity.

Today, they have deployed a Hyundai R215 excavator and they are crushing 20 mm and 40 mm down river bed material which is readily available at their project site, thus eliminating transportation cost.

All this was possible by using a BF90.3 crusher bucket on their Hyundai R215 excavator: with a single base machine and operator, they are running crusher bucket for approximately 10 hours per day, producing precise 20 mm and 40 mm down material as required for their project.

This led to significant reduction in the operating expenses and improved their overall project timelines.

Prior to securing this tender, they had deployed MB-R800 drum cutter in a tunnel making project in the neighbouring site and also bought a BF60.1 crusher bucket for their hydro project in another location.

Being a very satisfied customer with the product and support, customer had once again entrusted MB Crusher for their project requirements.

Hits: 0